Sheladia Associates, Inc.Sheladia Associates, Inc.

Second Road Improvement Project


Country:
Bangladesh
Financing Institution:
Asian Development Bank
Name of Client:
Ministry of Communications

Detail design of 211 km of roads selected from feasibility studies sponsored by the Asian Development Bank:

  • Widening and construction of shoulders of Sitalakhya-Daudkandi and Feni-Chittagong sections, and Chandina, Comilla, and Feni bypasses of the Dhaka-Chitaggong National Road (N-1, 100 km)
  • Widening and construction of shoulders on the Chittagong-Dohazari section of the Chittagong-Cox’s Bazar National Road (N-1, 16 km)
  • Widening and construction of shoulders on the Dhaka-Tangail National Road (N-4, 70 km) including bypass at Tangail
  • Widening and construction of shoulders on the Nabinagar-Chandra Road (15 km).

Brief Description of Services Provided
Pavement Engineer was responsible for the following:

  • Pavement design
  • Recycling of old pavement materials.

In addition, Pavement Engineer provided assistance with the following:

  • Establishment of design criteria
  • Discussion on suitable road improvement schemes
  • Preparation of draft report, drawings and documents
  • Preparation and delivery of final report, drawings and documents
  • Preparation and delivery of Project Completion Report.