Construction Supervision of TN RSP 03, and TNRSP 04, Tamil Nadu State Highways Project


Country:
India
Financing Institution:
Government of India and World Bank
Name of Client:
Tamil Nadu State Highways Project

The Tamil Nadu State Highways Project includes the upgrading and four-laning of three sections of the existing National Highway and has been divided into four main components:

  • Upgrading and rehabilitation of about 1,500 km of the important state roads
  • Strengthening of maintenance planning and work methods including periodic maintenance works
  • Improvement of the state’s capacity for managing road assets and ensure efficient road transport
  • Support of pilot programs to reduce road accidents.

SHELADIA/PARSONS was retained as supervision consultants for Phase I and IA of the works:

  • Nagapattinam – Kattumavadi (TNRSP-02)101 km
  • Kattumavadi – Ramanathapuram (TNRSP-03)100 km
  • Ramanathapuram – Tuticorin (TNRSP-04)120 km

Project includes 573 bridges and culverts, of which more than 15 are major bridges exceeding 100 m in length.

Brief Description of Services Provided
Construction supervision/quality assurance to ensure that:

  • Construction works are undertaken to specified alignment, levels and dimensions
  • Materials used in the permanent works comply with the specifications
  • Conformance to FIDIC conditions of contract
  • Appropriate construction procedures are used to ensure the end product is as envisaged by the specifications and drawings.

Technical control to ensure that:

  • Works being undertaken are appropriate for conditions on the ground
  • If required, designs are modified expeditiously to provide sound technical solutions to cater for any unforeseen or changed site condition.

Fiscal control to ensure that:

  • All interim and final payment certificates are justified on the basis of work completed and certified
  • All instructed variations, and costs arising from unforeseen additional work or circumstances are expeditiously valued
  • The contract is completed within tendered costs adjusted by justifiable changes and within the funds available.

Progress control to ensure that:

  • Works proceed according to the agreed schedule
  • Schedule program is continuously updated to reflect actual progress
  • The works are completed within the envisaged time schedule.
  • Training and technology transfer, including training needs assessments, and preparation and implementation of training programs.

The works mainly on the existing alignment and include:

  • Clearing of right-of-way
  • Sub-base, base and bituminous pavement
  • Raising the road formation in areas subject to flooding
  • Widening and paving of shoulders
  • Widening and stabilizing of embankments
  • Improvement to road geometrics
  • Replacement/improvement of culverts and bridges
  • Cross drainage structures
  • Planning of relocation of utilities
  • Road signage and markings
  • Other traffic safety features
  • Environmental mitigation measures
  • Rehabilitation and Resettlement.